Our footprint

kaiabr.jpg

Here’s Kaia standing where her bedroom will be.

march.jpg

here is the North wall, which will have soil half way up. The white reflection is from the surface bond material that was put on the concrete blocks.

march-2.jpg

This is most of the house footprint. The water proof membrane and insulation has been put on the external north wall, and most of the french drain is in. The plumbers will be out on Wed to start laying the lines, before we pour the foundation.

Leave a Reply