Well, we have the new footings poured… 30 feet from the old one. We have all the concrete blocks ready to go (north side wall), but the ground has been frozen, so we are on hold until it warms up a little.
Well, we have the new footings poured… 30 feet from the old one. We have all the concrete blocks ready to go (north side wall), but the ground has been frozen, so we are on hold until it warms up a little.